
Biography
Mr. Gunter is a Principal with Long International and has more than 35 years of experience in the petroleum refining, liquefied natural gas (LNG), midstream, pipeline, and power industries. Mr. Gunter has held positions in executive leadership, project management, engineering and maintenance management, mechanical engineering, and consulting.
His capital project management and consulting experience includes major projects in petroleum refineries, LNG, midstream, pipeline, and power generation facilities.
Through his professional experiences, Mr. Gunter has developed a thorough expertise of all stages of project development and execution including the management of engineering, procurement, contracting, construction, project controls, and commissioning. During his involvement with Long International, he performed analysis, and prepared reports on various major petroleum refinery and LNG projects.
Before joining Long International, Mr. Gunter was a Vice President, Project Director, Engineering Director, Maintenance Director, Turnaround Director, Senior Project Manager, and Mechanical Engineer for two large U.S. domestic owner/operators in the petroleum refining and midstream business sectors. Early in his career, he was a Mechanical Engineer for a power generation operator and employed in a large coal-fired facility. Mr. Gunter relies on his experience in the management of engineering, procurement, and construction projects, and engineering and maintenance of major industrial facilities to perform financial analysis, delay analysis, causation and damages analysis, technical analysis, evaluate project management standard of care, and prepare expert reports.
EDUCATION
B.S., Mechanical Engineering, Texas Tech University, 1986
PROFESSIONAL REGISTRATIONS
Registered Professional Engineer, Texas (No. 72955)
Chartered Engineer, Australia (No. 6209817)
Earned Value Professional, AACE International (No. 00843)
PROFESSIONAL AFFILIATIONS
AACE International
Project Management Institute
CONTACT US
Experience Matters
Our experts are ready to help.

Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.