The project involved the EPC of a greenfield LNG terminal including major berthing facilities and onshore storage, processing, and pumping services. Provided lead contract and claims support to the joint venture EPC contractor to ensure recovery of owner-caused impacts throughout the construction process. This involved managing and defending a major claim from the international earthworks subcontractor through litigation proceedings in both the U.S. and Mexico. The scope of work further involved detailed rebuttal of schedule, disruption, and damages analyses.

Gas, Gasification, GTL, LNG, and NGL

Mexico

The project involved the EPC of a greenfield LNG terminal including major berthing facilities and onshore storage, processing, and pumping services. Provided lead contract and claims support to the joint venture EPC contractor to ensure recovery of owner-caused impacts throughout the construction process. This involved managing and defending a major claim from the international earthworks subcontractor through litigation proceedings in both the U.S. and Mexico. The scope of work further involved detailed rebuttal of schedule, disruption, and damages analyses.

Gas, Gasification, GTL, LNG, and NGL

Angola

On behalf of an owner, analyzed schedule delay claims by a prime contractor on an LNG facility being constructed.

Gas, Gasification, GTL, LNG, and NGL

Spain, Italy

On behalf of an owner, analyzed delays and project management performance deficiencies in defense of a $40 million claim of an EPC contractor. The claim involved additional overhead and fee on a cost reimbursable contract for the management of the design and construction of an LNG terminal project that was delayed over 18 months. Analyzed deficiencies in the EPC contractor’s schedules and analyzed concurrent delays. Prepared the basis of a counterclaim by the owner against the EPC contractor.

Gas, Gasification, GTL, LNG, and NGL

Angola

On behalf of an owner, analyzed the EPC schedules for a $2.7 billion LNG facility. Verified the schedule work scope against contract requirements. Evaluated schedule metrics, reviewed schedule logic, and assessed critical path reasonableness.

Gas, Gasification, GTL, LNG, and NGL

Australia

On behalf of an owner of an LNG plant, assessed an EPC contractor’s positions with respect to the eligibility of management personnel entitled to be included in delay costs.

Gas, Gasification, GTL, LNG, and NGL

Australia

On behalf of an owner of an LNG plant, assessed an EPC contractor’s expert’s quantification of costs incurred at the module fabrication yards and the contractor’s quantification of its management personnel costs during the delay period. Prepared two expert reports submitted as part of arbitration proceedings.

Gas, Gasification, GTL, LNG, and NGL

Australia

On behalf of the owner of an LNG project, reviewed an EPC contractor's values for reimbursable subcontracts and other estimated reimbursable costs and prepared a schedule and cost risk analysis. Preparing expert reports as part of an arbitration proceeding.

Gas, Gasification, GTL, LNG, and NGL

Georgia

On behalf of an owner, participated in the preliminary analysis and evaluations of delay and disruption claims by an EPC contractor on a large LNG project in the southeastern United States. Evaluated multiple EPC contractor delay claim submissions and reports that included calculation of delay costs. The owner used these independent evaluations in pre-mediation discussions and negotiations.

Gas, Gasification, GTL, LNG, and NGL

Australia

On behalf of an owner, evaluated delayed engineering that affected the timely delivery of construction work packages to the construction contractors on the pipeline and gas recovery facilities associated with an LNG facility.

Gas, Gasification, GTL, LNG, and NGL

Australia

On behalf of an owner seeking to recover hundreds of millions of dollars in delay and disruption costs paid to an EPC contractor on an LNG plant, performed the following scope of work: 1) critique of the contractor’s compliance with industry practices in the preparation and updating of the project baseline CPM schedule and schedule updates; 2) preparation of a windows-based schedule delay analysis to quantify delays on the critical and near-critical paths; 3) assessment of delay, disruption, and project management performance issues by the EPC contractor; and 4) quantification of delay and disruption damages incurred by the subcontractors in the construction of the facility. Prepared an expert report to be submitted as part of arbitration proceedings.

CONTACT US

Experience Matters

Our experts are ready to help.

Long International 25th Anniversary Logo

Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.