Provided scheduling support to the estimating team for the $77 million Highbridge Yard Maintenance Facility. Developed pre-bid schedule and aided in the development of Baseline CPM Schedule. The project consisted of the construction of a 62,000 SF rail car maintenance facility (ten car lengths) with two tracks and the installation of associated maintenance and repair equipment. The facility also included an additional 8,300 SF of office space and employee locker rooms located on the second floor. Other project components included the construction of 35,000 feet of track along with 32 switches and electric substation, as well as an employee station.

Transportation

New York

Provided scheduling support to the estimating team for the $77 million Highbridge Yard Maintenance Facility. Developed pre-bid schedule and aided in the development of Baseline CPM Schedule. The project consisted of the construction of a 62,000 SF rail car maintenance facility (ten car lengths) with two tracks and the installation of associated maintenance and repair equipment. The facility also included an additional 8,300 SF of office space and employee locker rooms located on the second floor. Other project components included the construction of 35,000 feet of track along with 32 switches and electric substation, as well as an employee station.

Transportation

Connecticut, Massachusetts

Performed schedule delay analyses and prepared expert and rebuttal reports for a general contractor in claims against the owner on the Amtrak Northend Electrification Project from Boston to New Haven.

Transportation

Ohio, Pennsylvania, Indiana, Illinois, Virginia, New York

Prepared an owner/operator’s claim against a major railroad for causing delays and cost overruns during the construction of fiber optic communications systems along the railroad’s right-of-ways. Developed schedule delay analysis of each of the right-of-ways along which the fiber optic cable was installed in trenches. Identified detailed daily documentation that identified railroad interference or lack of support for the installation of the work.