On behalf of an equipment supplier, developed estimates to complete four power plant projects that the contractor left incomplete.

Power

Algeria

On behalf of an equipment supplier, developed estimates to complete four power plant projects that the contractor left incomplete.

Gas, Gasification, GTL, LNG, and NGL

Algeria

On behalf of an owner, performed a detailed schedule quality assurance review of the engineering, procurement, construction, commissioning and start-up activities of a central processing facility (CPF). The CPF consisted of utilities, inlet separation, two oil trains, associated gas compressors, natural gas liquids and injection gas units. Identified logic problems and overuse of constraints, which made the indicated critical and near-critical paths questionable.

Gas, Gasification, GTL, LNG, and NGL

Algeria

On behalf of a major international oil company, analyzed the quantum aspects of an EPC contractor’s $130 million delay and changed conditions claim. The claim involved the relocation of a gas processing plant project site after construction had commenced because of the discovery of unfavorable soil conditions. Prepared an expert report and rebuttal expert report and testified in ICC arbitration. The EPC contractor’s claim was denied, and the owner’s liquidated damages claim was upheld.