Assisted a general contractor in a $2 million dispute with the owner of a 200 MW power plant in New Brunswick. Issues involved increased labor costs associated with late delivery of owner-supplied equipment, late design information, and defective design information. The case was settled during negotiation on terms favorable to the client.

Power

New Brunswick, Canada

Assisted a general contractor in a $2 million dispute with the owner of a 200 MW power plant in New Brunswick. Issues involved increased labor costs associated with late delivery of owner-supplied equipment, late design information, and defective design information. The case was settled during negotiation on terms favorable to the client.

Power

New Brunswick, Canada

On behalf of underwriters, as a result of a potentially insured event, evaluated whether other causes of schedule delay to the shutdown and refueling of a nuclear power plant would have caused concurrent delays to the project. Participated as a member of the Loss Adjuster’s Team of experts concerning a $140 million property damage claim and a $255 million delayed start-up claim. Evaluated Primavera schedules, analyzed opposing expert’s reports, and provided support to loss adjusters, counsel, and underwriters at market meetings.

Gas, Gasification, GTL, LNG, and NGL

New Brunswick, Canada

On behalf of an insurance company, analyzed delays related to the construction of an LNG terminal in New Brunswick. The delay analysis included equipment to unload tanker, transfer to LNG storage tanks, vaporization of the LNG, and metering of the gas as it was introduced into a natural gas pipeline. The owner filed the claim because materials were lost overboard at sea in severe weather while being shipped to the site.