Performed an extension of time claim review, schedule delay analysis, and forensic planning analysis for a central processing facility to collect gas received from all the concession well fields to be compressed prior to transport via pipeline to the treatment plant. The gas pipeline was 24″ in diameter and 370 km in length with a maximum capacity of 10 million Sm3/day.

Pipelines and Utilities

Tunisia

Performed an extension of time claim review, schedule delay analysis, and forensic planning analysis for a central processing facility to collect gas received from all the concession well fields to be compressed prior to transport via pipeline to the treatment plant. The gas pipeline was 24" in diameter and 370 km in length with a maximum capacity of 10 million Sm3/day.

Gas, Gasification, GTL, LNG, and NGL

Tunisia

On behalf of the owner, performed an independent preliminary review and assessment of the contractor’s claims and its entitlement for an extension of time on a central gas processing facilities project. During the review, analyzed relevant project schedules, documents, information, and particulars provided by the owner. Prepared a report evaluating the delay issues alleged by the contractor for use in anticipation of arbitration.

CONTACT US

Experience Matters

Our experts are ready to help.

Long International 25th Anniversary Logo

Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.