Building Construction

Share

Prepared a report, damage analysis, and schedule analysis on behalf of a subcontractor for a $450,000 change order on the construction of a parking structure with post-tensioned structural concrete. Prepared an as-built “but-for” schedule analysis and calculated claimed costs.