Refineries, Petrochemical, and Chemical

Share

On behalf of an insurer representing a contractor, prepared an expert report and provided testimony regarding the analysis of an owner’s property damage claim following a fire at an oil terminal, which damaged the tank areas, including associated equipment, piping, electrical and instrumentation. Also evaluated the validity of the owner’s warranty claims that existed prior to the fire and included in the owner’s alleged damages. Prepared an expert report and testified in deposition, which led to a settlement of the dispute.

CONTACT US

Experience Matters

Our experts are ready to help.

Long International 25th Anniversary Logo

Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.