Construction Claim Types for Contractors
U.S. federal and state courts recognize 19 basic construction claim entitlements for a contractor’s recovery of damages.
Our Blog
Richard J. Long , P.E. , P.Eng. , Andrew Avalon , P.E. , PSP
U.S. federal and state courts recognize 19 basic construction claim entitlements for a contractor’s recovery of damages.
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
Richard J. Long , P.E. , P.Eng. , Andrew Avalon , P.E. , PSP
This is the first of two blog posts examining concurrent delay, a vexed and complex technical and legal issue.
Richard J. Long , P.E. , P.Eng. , Andrew Avalon , P.E. , PSP
The determination of what constitutes a cardinal change depends upon a court or arbitration panel decision and the unique contract language at issue.
Richard J. Long , P.E. , P.Eng. , Andrew Avalon , P.E. , PSP
Delays resulting from acts of God are normally excusable but noncompensable events in the absence of a contract clause stating otherwise.
Richard J. Long , P.E. , P.Eng. , Andrew Avalon , P.E. , PSP
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
Eric J. Klein , Ph.D. , P.E. , PMP
This is the eighth post in an eight-part series that summarizes potential impacts of the COVID‑19 pandemic on the construction industry.
Eric J. Klein , Ph.D. , P.E. , PMP
This is the seventh post in an eight-part series that summarizes potential impacts of the COVID‑19 pandemic on the construction industry.