Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
This post on the planning and scheduling of wind farm construction is the second in a series about onshore wind energy.
This post on wind power basics and the components of wind turbines and wind farms is the first in a series about onshore wind energy.
This is the fourth blog post in a four-part series about external early start date and external late finish date constraints.
This is the third blog post in a four-part series about external early start date and external late finish date constraints.
This is the second blog post in a four-part series about external early start date and external late finish date constraints.
This is the first blog post in a four-part series about external early start date and external late finish date constraints.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.