Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
Richard J. Long , P.E. , P.Eng.
This post describes use of the Modified Total Cost method in construction claims, with case examples.
Richard J. Long , P.E. , P.Eng.
This post addresses topics related to the Total Cost method, including the Total Cost cumulative impact claim.
Richard J. Long , P.E. , P.Eng.
This post discusses the Total Cost method, including elements of proof, theoretical bases, and prerequisites.
Richard J. Long , P.E. , P.Eng.
Construction contracts should specify all that is required for Mechanical Completion to prevent related disputes between the owner and contractor.
Richard J. Long , P.E. , P.Eng.
This blog post, third in a series, includes examples of maladministration claims in construction contracts as well as contractor’s remedies.
Richard J. Long , P.E. , P.Eng.
This blog post, part of a series on maladministration claims in construction contracts, focuses on failure to assign work and failure to coordinate.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.