Biography

Mr. Gunter is a Principal with Long International and has more than 35 years of experience in the petroleum refining, LNG, midstream, chemical/petrochemical, pipeline, power, and consulting industries. Mr. Gunter has held positions in executive leadership, project management, engineering and maintenance management, mechanical engineering, and consulting.

Through his professional experiences, Mr. Gunter has developed a thorough expertise of all stages of project development and execution including the management of engineering, procurement, contracting, construction, project controls, and commissioning. Since joining Long International, Mr. Gunter has performed analysis and prepared expert reports involving construction and contract disputes on various major petroleum refinery, chemical/petrochemical, and LNG projects.

Before joining Long International, Mr. Gunter was a Vice President, Project Director, Engineering Director, Maintenance Director, Turnaround Director, Senior Project Manager, and Mechanical Engineer for two large U.S. domestic owner/operators in the petroleum refining and midstream business sectors. Early in his career, he was a Mechanical Engineer for a power generation operator and employed in a large coal-fired facility. Mr. Gunter relies on his experience in the management of engineering, procurement, and construction projects and engineering and maintenance of major industrial facilities to perform financial analysis, delay analysis, causation and damages analysis, and technical analysis; evaluate project management and construction management standard of care; and prepare associated expert reports.

EDUCATION

B.S., Mechanical Engineering, Texas Tech University, 1986

PROFESSIONAL REGISTRATIONS

Registered Professional Engineer, Texas (No. 72955)
Chartered Engineer (Retired), Australia (No. 6209817)
Earned Value Professional, AACE International (No. 00843)

PROFESSIONAL AFFILIATIONS

AACE International
Project Management Institute

Contact Us

" " indicates required fields

CONTACT US

Experience Matters

Our experts are ready to help.

Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.