INDUSTRIES WE SERVE

Extensive U.S. and International Consultant Experience

Our national and international consultants specialize in a variety of claims services and project management in the building, energy, power, industrial, manufacturing, refining, petrochemical, chemical, mining, water, wastewater, and transportation sectors.

We provide:

  • Engineering and construction claims consulting
  • Cost and damages analysis
  • Construction loss of productivity analysis
  • Schedule delay analysis
  • Standard of care analysis
  • Construction insurance claims analysis
  • Project management consulting
  • Risk analysis
  • Schedule quality assurance reviews
  • Claims prevention training
  • Arbitration and litigation expert witness services

Cranes at a construction site

Building Construction

Our building construction experience includes major commercial, correctional, educational, government, hotel, medical, and residential facilities.

Tanker ship transporting oil from refinery unloading at port

Gas, Gasification, GTL, LNG, and NGL

Our experience includes Gas, Gas-to-Liquids (GTL), Liquified Natural Gas (LNG), and Natural Gas Liquids (NGL) plants.

Electric wheel grinding on steel structure in factory

Industrial and Manufacturing

Our industrial and manufacturing experience includes cement, fiberglass, food processing, glass, microchip, paper, smelter, and steel mill facilities.

Truck transporting gold ore at a modern gold mine

Mining and Mineral Processing

We provide services to both owners and contractors concerning mining projects, mineral processing facilities, and mine remediation.

Chemical petroleum petrochemical refinery storage tank farm

Refineries, Petrochemical, and Chemical

We are experienced in chemical, chemical storage, CO2 recovery, condensate, fuel gas desulphurization, ethanol, nitrogen, petrochemical, and refinery projects.

Tender Drilling Oil Rig (Barge Oil Rig)

Offshore Oil and Gas

Our experience encompasses floating natural gas platforms, floating production storage and off-loading facilities, drilling rigs, gas compression and wellhead platforms, oil terminals, and undersea pipelines.

Oil sands

Oil Sands

Our expert team has many years of experience working on oil sands projects, including Steam-Assisted Gravity-Drainage (SAGD) facilities.

Pipeline bridge

Pipelines and Utilities

We serve both owners and contractors involving claims related to pipeline and utility projects located around the world.

Electrician working on electrical tower and power lines

Power

We understand biomass, coal-fired, cogeneration, combined cycle, gas-fired, geothermal, hydroelectric, HRSG, and nuclear power facilities, and more.

Expressway

Transportation

We are experienced with a variety of transportation projects including airport, heavy and light rail, railroad, road, highway, bridge, and tunnel projects.

Modern urban wastewater treatment plant

Water, Wastewater, Dams, and Marine

Our project experience includes marine ports, dams, sewers, sludge facilities, wastewater treatment plants, water distribution pipelines, and wharfs.

Tuneller welding in underground subway construction site

Project Experience

We invite you to explore the numerous projects we have been involved in worldwide.

CONTACT US

Experience Matters

Our experts are ready to help.

Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.

Skip to toolbar