Offshore Oil and Gas
Brazil, United Arab EmiratesOn behalf of an owner, assessed a contractor’s claims involving change orders, delays, and acceleration regarding the design and installation of the topsides for a deep-sea crude oil FPSO project to be installed in Brazil. Evaluated the contractor’s claims regarding loss of productivity for the refurbishment work of the FPSO vessel and for the topsides installation in Dubai. Also supported the owner in resolving a subsea contractor’s prolongation claim.