MinnesotaOn behalf of a contractor, analyzed damages to rebut a $52 million claim from the owner on a large wastewater tunnel. Audited and reconciled $166 million in actual costs versus an after the fact estimate of $114 million.
On behalf of a contractor, analyzed damages to rebut a $52 million claim from the owner on a large wastewater tunnel. Audited and reconciled $166 million in actual costs versus an after the fact estimate of $114 million.
On behalf of a contractor, analyzed damages to rebut a $52 million claim from the owner on a large wastewater tunnel. Audited and reconciled $166 million in actual costs versus an after the fact estimate of $114 million.
Provided analysis and review of delay claims that a contractor submitted due to soil contamination caused by underground gasoline tanks on a federal courthouse project.
Provided a claims prevention training seminar for a U.S. contractor that specializes in the design and construction of HRSGs.
Provided a claims prevention training seminar for a contractor that manufactures and installs heat recovery steam generators (HRSG) on power plant projects.