Gas, Gasification, GTL, LNG, and NGL

Share

On behalf of an insurance company, analyzed delays related to the construction of an LNG terminal in New Brunswick. The delay analysis included equipment to unload tanker, transfer to LNG storage tanks, vaporization of the LNG, and metering of the gas as it was introduced into a natural gas pipeline. The owner filed the claim because materials were lost overboard at sea in severe weather while being shipped to the site.