Oil Sands

Share

On behalf of interested underwriters, performed cost and data analysis and prepared an expert report for an insurance adjuster. The claim related to a fire loss that was the result of a line failure that caused an oil-based thinning agent to leak at a bitumen upgrader settling basin. The loss occurred for one of the largest operators in the Canadian oil sands industry and its joint venture companies. The facility is an embankment dam that was, by volume of construction material, the largest earth structure in the world in 2001.