Excavator and bulldozers working on a construction site

PROJECT EXPERIENCE

Experience Matters

Long International serves the global construction industry on projects of all types and sizes, as well as disputes of various complexities.

Filter Results

Industry & Project Type
Locations

Building Construction

Florida

Furnished CPM scheduling services for a building contractor on multiple $40 million+ high rise condominium complexes in Miami and West Palm Beach.

Building Construction

Florida

On behalf of a contractor and underwriter, analyzed reduced operating cash flows for a mixed-use building, including $5.1 million in damages claimed by the plaintiffs for alleged loss of profits related to the conversion of the apartment units to an independent living facility.

Building Construction

Tennessee

On behalf of a subcontractor, prepared a schedule delay and damages claim for the fabrication and installation of glass and metal curtainwalls for the Memphis/Shelby County Library Project.

Building Construction

Russia

On behalf of an owner, analyzed a Russian and Turkish contractor’s claim for change orders, delay, and loss of productivity, and the owner’s counterclaims for default due to inadequate project management performance and substandard installations of a residential community project. Developed a document database, inspected the site, reviewed contractual entitlements, and provided the owner with a basis for negotiating a settlement with the contractor.

Building Construction

Colorado

Prepared a report, damage analysis, and schedule analysis on behalf of a subcontractor for a $450,000 change order on the construction of a parking structure with post-tensioned structural concrete. Prepared an as-built “but-for” schedule analysis and calculated claimed costs.

Building Construction

Florida

Analyzed and presented schedule impacts and litigation support services for a public schools district in defense of a general contractor’s claims on four elementary schools.

Building Construction

California

Analyzed detailed as-planned and as-built schedules for two state prison projects and a city prison project.

Building Construction

Colorado

Prepared a contractor’s $250,000 change request for delay and disruption associated with structural, mechanical, and electrical design changes in the construction of a correctional facility.

Building Construction

Kuwait

Prepared a $45 million claim including delay analysis and damages calculations for an Italian construction firm that constructed two hospitals.

Building Construction

Texas

Prepared an electrical subcontractor’s claim for delays, extra work, and loss of productivity on the installation of fire alarm, security, and communication systems for the Federal Bureau of Prisons Project in Beaumont. The contractor’s increased costs resulted from delays, changes, field work orders, rework, loss of productivity, and acceleration to the Division 17 installation work. Prepared an expert report, and assisted counsel in the defense of the opposing expert’s deposition, which resulted in a successful settlement of the dispute.

CONTACT US

Experience Matters

Our experts are ready to help.

Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.