Gas, Gasification, GTL, LNG, and NGL
AustraliaOn behalf of an owner, analyzed rework costs caused by defective engineering and poor project management performance by the EPCM contractor of a LNG facility. Developed a basis for estimating the rework costs and prepared several comprehensive reports that the owner used to facilitate a large settlement against the contractor.