Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
This blog post explains how a contractor successfully mitigated a schedule and resolved an insurance claim after an extreme weather event.
Richard J. Long , P.E. , P.Eng.
This is the second of two blog posts on impossibility of performance. This post discusses economic hardship, risk assumption, and remedy.
Richard J. Long , P.E. , P.Eng.
This is the first of two blog posts on impossibility of performance. This post discusses physical and economic impossibility.
Richard J. Long , P.E. , P.Eng.
This is the second of two blog posts about non-excusable, non-compensable delays, for which the contractor is responsible.
Richard J. Long , P.E. , P.Eng.
This is the first of two blog posts about non-excusable, non-compensable delays, for which the contractor is responsible.
Richard J. Long , P.E. , P.Eng.
This post discusses excusable, compensable delays, which entitle contractors to both compensatory damages and time extensions.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.