Featured Blog Post
Richard J. Long , P.E. , P.Eng. , Andrew Avalon , P.E. , PSP
Construction Claim Types for Contractors
U.S. federal and state courts recognize 19 basic construction claim entitlements for a contractor’s recovery of damages.
Our Blog
Richard J. Long , P.E. , P.Eng. , Andrew Avalon , P.E. , PSP
U.S. federal and state courts recognize 19 basic construction claim entitlements for a contractor’s recovery of damages.
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
Richard J. Long , P.E. , P.Eng. , Andrew Avalon , P.E. , PSP
This post explores contract language related to differing site conditions (DSC) and paths by which a contractor might recover from DSC.
Richard J. Long , P.E. , P.Eng. , Andrew Avalon , P.E. , PSP
This is the first of two blog posts about differing site conditions (DSC). It explains Types I, II, and III DSC and DSC claims.
Richard J. Long , P.E. , P.Eng.
This is the second of two blog posts on impossibility of performance. This post discusses economic hardship, risk assumption, and remedy.
Richard J. Long , P.E. , P.Eng.
This is the first of two blog posts on impossibility of performance. This post discusses physical and economic impossibility.
Richard J. Long , P.E. , P.Eng.
This blog post discusses excusable delays in construction, including compensable and non-compensable delays.
Richard J. Long , P.E. , P.Eng.
Delays in construction contracts are usually categorized as one of three types. This post defines each type, with examples.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.