Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post discusses mass transfer processes. It is part of a series that describes process engineering terminology.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post discusses heat transfer processes. It is part of a series that describes process engineering terminology.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post discusses fluid flow processes. It is part of a series that describes process engineering terminology.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This blog post defines process engineering terminology commonly encountered when describing industrial processes and associated equipment.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post provides an overview of the various drawing types that are used to depict industrial processing and manufacturing plants.
Richard J. Long , P.E. , P.Eng.
This is the fourth post in a four-part series.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.