Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post describes scenarios where engaging a chemical engineer as an expert witness can significantly benefit the outcome of a case.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post discusses the typical chemical engineer’s training and expertise and the role of a chemical engineer as an expert witness.
This post explores the benefits of engaging an expert witness early and how to choose the right expert witness.
This post delves into the scenarios where the involvement of a professional electrical engineer is crucial.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post explores three flue gas desulfurization process flows and associated chemistries as applied to coal-fired power plants.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post provides high-level overviews of FGD technologies with respect to sulfur dioxide capture applications at coal-fired power plants.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.