Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
David T. Hulett , Ph.D. , FAACE , Richard J. Long , P.E. , P.Eng.
This post addresses components of a well-structured quantitative schedule and cost risk analysis procedure.
David T. Hulett , Ph.D. , FAACE , Richard J. Long , P.E. , P.Eng.
This post covers the purpose of quantitative schedule and cost risk analysis, its typical results, and how the results are used.
Richard J. Long , P.E. , P.Eng.
This post explores the cost-benefit of the owner choosing to furnish items for construction projects.
Richard J. Long , P.E. , P.Eng. , Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This is the first post in a two-part series on the role and benefit of a construction consultant.
David T. Hulett , Ph.D. , FAACE
This post addresses challenges and best practices for quantitative cost risk, schedule risk, and integrated cost-schedule risk analysis.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.