Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
Richard J. Long , P.E. , P.Eng.
This post is part of a series defining industry terminology. This post addresses language related to scheduling and delay.
Richard J. Long , P.E. , P.Eng.
This post is part of a series defining industry terminology. This post addresses construction labor and loss of productivity.
Richard J. Long , P.E. , P.Eng.
This post is part of a series defining industry terminology. This post defines language related to costs, damages, and cost estimating.
Alex Bachowski , P.E. , PMP , PSP
Standard of care applies to owner actions—and inactions—during project execution. This blog post offers tips for avoiding unexpected legal trouble.
Richard J. Long , P.E. , P.Eng.
This post addresses resource loading and leveling, schedule accuracy, and developing and maintaining the change control process.
Richard J. Long , P.E. , P.Eng.
This is the first of two posts on key elements of scheduling that contribute to successful schedule management.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.