Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
Richard J. Long , P.E. , P.Eng.
This is the fourth post in a four-part series.
Richard J. Long , P.E. , P.Eng.
This is the third post in a four-part series.
Richard J. Long , P.E. , P.Eng.
This is the second post in a four-part series.
Richard J. Long , P.E. , P.Eng.
This is the first post in a four-part series.
Richard J. Long , P.E. , P.Eng.
This post identifies six factors that affect the compensability of P&ID changes after the FEED package is issued.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post describes scenarios where engaging a chemical engineer as an expert witness can significantly benefit the outcome of a case.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.