Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
Stephen P. Warhoe , Ph.D. , P.E. , CCP , CFCC
This post addresses how delay experts select methodologies, how counsel should evaluate those selections, and how to defend them in litigation and arbitration.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post discusses heat transfer processes. It is part of a series that describes process engineering terminology.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post discusses fluid flow processes. It is part of a series that describes process engineering terminology.
This post discusses challenges to accurately quantifying change-related hours in construction disputes involving labor productivity losses.
Richard J. Long , P.E. , P.Eng.
This blog post discusses excusable delays in construction, including compensable and non-compensable delays.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This blog post defines process engineering terminology commonly encountered when describing industrial processes and associated equipment.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.