Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
Richard J. Long , P.E. , P.Eng.
Delays in construction contracts are usually categorized as one of three types. This post defines each type, with examples.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post provides an overview of the various drawing types that are used to depict industrial processing and manufacturing plants.
Richard J. Long , P.E. , P.Eng.
Project management experts can be of vital assistance to an owner’s or contractor’s lawyer in preparing or opposing construction claims.
Richard J. Long , P.E. , P.Eng.
This is the second post in a series on the role of project management experts in the preparation or opposition of construction claims.
Richard J. Long , P.E. , P.Eng.
Learn about the role of project management experts in the preparation or opposition of construction claims.
Alex Bachowski , P.E. , PMP , PSP
Write a notice letter that actually preserves your rights with these tips and insights. Includes a downloadable notice letter template.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.