Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
This post delves into the scenarios where the involvement of a professional electrical engineer is crucial.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post explores three flue gas desulfurization process flows and associated chemistries as applied to coal-fired power plants.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post provides high-level overviews of FGD technologies with respect to sulfur dioxide capture applications at coal-fired power plants.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post provides overviews of sulfur dioxide pollution and emissions regulations, the FGD industry, and global FGD market trends.
This post discusses aspects of constructing a wind farm. This is the fifth post in a series about onshore wind energy.
This post discusses the major permitting, regulatory approvals, and contracts associated with the development of an onshore wind farm.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.