Featured Blog Post
Richard J. Long , P.E. , P.Eng.
Problematic Construction Contract Clauses
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
Our Blog
Richard J. Long , P.E. , P.Eng.
This is the first post in a series that discusses construction contract terms that cause difficulties and give rise to…
The author summarizes the definitions of the 19 construction claim types that may apply to a contractor’s and subcontractor’s recovery of time and costs.
Read
The desire to minimize costs and contractual performance time often leads to directed or constructive acceleration.
READ
This post explores constructive changes, which are a common cause of construction claims, and problems establishing entitlement.
READ
Richard J. Long , P.E. , P.Eng.
The Discrete Damages/Cost Variance Analysis method is a variation of the Delta Estimate and Modified Total Cost methods.
This is the third post in a five-part series about construction labor strikes and contractors’ potential recovery of delay and damages.
Richard J. Long , P.E. , P.Eng.
When owner-caused impacts increase contractor costs, the contractor may consider the Delta Estimate method to calculate damages.
Richard J. Long , P.E. , P.Eng.
The A/B Estimate method is advantageous because of its simplicity but is difficult to use if several different factors affect a contractor’s performance.
Richard J. Long , P.E. , P.Eng.
In some situations, contractors may pursue recovery under a quasi-contractual remedy known as “Quantum Meruit.”
This is the second post in a five-part series about construction labor strikes and contractors’ potential recovery of delay and damages.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.